Due to new regulations, a temporary lined basin needed to be constructed to accept plant, process water. To prepare the sub grade, bottom ash and rock were excavated and removed from the site. A concrete forebay and five, 36” HDPE pipes were constructed and installed to maintain water flow. The completion of the project was the first of the multiple phases required to clean close the remaining basins.

Download Case Study (PDF)

Project Challenges & Solutions

Water Level Management

Trans Ash employed a water management subcontractor to install hundreds of well points and remove the sub surface water to keep the work area safe and ensure the water remained below the specified elevation.

Changing Conditions

Trans Ash utilized an excavator with a hammer attachment to demolish an unexpected section of rock, while working concurrently on other project activities.

Sub Grade Construction

The biggest challenge of the project was placing a sub grade of #57 stone, to grade, on the slopes of the forebay below the concrete. Trans employed an additional work force and multiple surveyors to continually check grade and adjust, as necessary, to maintain grade until the concrete was ready to be poured.

Contact the Team at Trans Ash for Your Next Project

Contact us today to see how our services can help you or your business. We’re able to answer any questions you have, provide a list of service offerings, and discuss future employment possibilities.

Want to learn more about Trans Ash? Visit our Markets & Solutions section, browse our Project Case Studies, or call us at 513-733-4770.