Clear & Grub

64 AC

Liner Installed

64 AC

Closure Turf Installed

64 AC

Project Details

Due to new Federal and State CCR regulations, multiple CCR basins had to be excavated and the material placed in a newly constructed, adjacent landfill. This large volume, high visibility project had a state mandated completion date that required minimal CCR exposure, necessitating landfill closure immediately upon completion of the first phase fill.

Download Case Study (PDF)

Project Challenges & Solutions

Harsh Climate Conditions

Trans Ash’s construction plan created a project and water management system that ensured the site was constantly prepared for extreme weather events, including a Category 1 hurricane.

Challenging Access

Trans Ash coordinated deliveries with material suppliers and employed smaller, more flexible equipment to ensure timely delivery of materials and provide uninterrupted operation.

Proper Protection

Trans Ash worked cooperatively with the client and design engineer to design and install a geocomposite base system that protected the turf and ensured stability.

Contact the Team at Trans Ash for Your Next Project

Contact us today to see how our services can help you or your business. We’re able to answer any questions you have, provide a list of service offerings, and discuss future employment possibilities.

Want to learn more about Trans Ash? Visit our Markets & Solutions section, browse our Project Case Studies, or call us at 513-733-4770.